Customs guarantee
A customs guarantee is a financial tool that helps construction companies manage their cash flow and operations efficiently while ensuring compliance with UK customs regulations. It is a form of financial assurance provided to HM Revenue and Customs (HMRC) to cover any potential customs duties, VAT, or other taxes and charges that may be due on goods imported into the UK.
For construction projects, this might be relevant when importing construction materials, machinery, or equipment from abroad. The customs guarantee ensures that the importer (often the construction company or a related party) complies with customs regulations and that the UK government will receive any due payments even if the importer is unable to pay later. It allows goods to be released from customs without immediate payment of duties, taxes, or VAT, facilitating smoother and faster operations in construction projects.
The guarantee can be in the form of a bank guarantee, insurance policy, or cash deposit. It must be acceptable to HMRC and cover the potential liabilities. In construction, where timelines are tight and materials are often imported, having a customs guarantee can be crucial for avoiding delays that might otherwise occur while waiting for customs clearance.
[edit] Related articles on Designing Buildings
- 5 Essential Tips for the Import / Export Trade
- Advance payment bond.
- Bonds and guarantees.
- Brexit.
- Cash flow.
- Guarantee.
- Late payment.
- Parent company guarantee.
- Performance bonds.
- Retention of title.
- Vesting certificate.
[edit] External references
Featured articles and news
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.
Internally insulating a historical building
An experimental DIY approach using mineral thermal lime plaster.
Tree species selection for green infrastructure: A guide for specifiers.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.